Lockport, City |
Code of Ordinances |
Part II. General Legislation |
Chapter 158. Streets and Sidewalks |
Article I. Miscellaneous Provisions |
§ 158-33. Drainage piping.
Latest version.
-
A.Any person, firm or corporation wishing to install drainage piping in a City right-of-way, must first obtain the permission of the Commissioner of Public Works or his duly designated representative. Said permission is subject to the following:(1)Submission of the request in writing, detailing the property to be affected and verification that the property is owned by the person making the request.(2)Approval by the Commissioner of Public Works as to the size and material and installation procedure.(3)Filing of a certificate of insurance (in an amount not less than $1,000,000) with the City Clerk, naming the City of Lockport as additional insured and holding the City of Lockport harmless as it relates to the installation of said drainage pipe.(4)Adherence to street opening regulations.Editor's Note: See § C-370, Permit to dig in streets, and § 370a, Relative to the opening of streets.B.Upon acceptance by the Commissioner of Public Works or his designated representative, the City of Lockport shall accept responsibility for any future maintenance or replacement of said drainage pipe.
Added 7-19-2000